Australian Stock Exchange
$0.031
Visit ASX Website
Gold Price
US$1229.00 / oz

If you are seeing this you don't appear to have Flash
installed or it is out of date click here to download.

Latest News

Friday, 12 September 2014
Capital Raising Plans Finalised Funding For Pre-Development Work
Wednesday, 10 September 2014
Half yearly report released for period ending June 30.
Monday, 8 September 2014
Shambesai Gold Project sanitary protect zone approved.

View news stories

Manas Highlights

Gold explorer in the Kyrgyz Republic
Production scheduled for 2014
Total JORC Resource base 1.25Moz
Exploring for Carlin‐style gold deposits

Subscribe

Enter your details below to join our email newsletter

Glossary of Technical Terms

Au - Chemical symbol for gold.

Auger Drilling - A drilling method in which the sample is brought to the surface via a helical or spiral rods.

g/t - grams per tonne

ppb - parts per billion. E.g. 1000 ppb Au equals 1 ppm Au, or 1 g/t Au.

ppm - parts per million, equivalent to g/t.

RAB Drilling - Rotary Air Blast drilling. A drilling method in which the sample is brought to the surface outside of the drill rods using compressed air.

RC Drilling - Reverse Circulation drilling. A drilling method in which the sample is brought to the surface inside the drill rods using compressed air, reducing contamination

Diamond Drilling- A rotary type of rock drill which cuts by abrasion rather than percussion. The cutting bit is set with diamonds and attached to the end of long hollow rods through which water is pumped to the cutting face.

 

 
Print this page